Our Portfolio

The Esquimalt Fleet Maintenance Facility at Cape Breton is a 370,300 sq. ft. Fleet Maintenance Facility. Apollo Sheetmetal provided the HVAC Ductwork for the project.

The UBC Exchange is a 26,940 m2 integrated student residence and bus exchange facility. Apollo Sheetmetal supplied the HVAC ductwork for the project.

The Triomphe building project includes 46 floors with a 10,000 sqft presentation center. Apollo Sheetmetal provided the HVAC ductwork for the entire project.

YVR A-B Connector expanded the Domestic Terminal allowing passengers traveling to enjoy new shops restaurants and services. Apollo Sheetmetal supplied the HVAC Ducting for this remarkable and innovative expansion.

Marine Gateway on the Canada Line combines the work-life balance by combining 415 condominium suites and new high-quality LEED Gold office space. Apollo Sheet Metal installed  the slab duct in the residential towers and all the HVAC ductwork...

parq Vancouver is an urban resort. Apollo Sheetmetal supplied the HVAC Ductwork for the entire project.

parq Vancouver will feature approximately 600 slots, 75 table games, a 569-room hotel (including a 329-room, JW Marriott, and a 188-...

The Teck Acute Care Centre houses many facilities including the emergency, medical imaging, and ICU suites for the BC Children's Hospital. Apollo Sheetmetal provided HVAC Ductwork.

This 300-bed hospital and cancer centre was completed in July 2008. It was British Columbia’s first new regional hospital in 30 years. To allow for more usable occupied space in the building, the ventilation design incorporated a large...

This 375,000 square-foot hospital was Apollo’s first Public Private Partnership (P3) project. The P3 contract was a new technique in the bidding and awarding of construction projects in the province at the time.

Apollo Sheet Metal...

The188,000-square-foot new full-service hospital was completed as a Public Private Partnership (P3) contract, on time and on budget. As a full-service hospital, it contained many specialized ventilation requirements that were fabricated and...

The 180,000 square-foot new full-service hospital serves the North Okanagan and was delivered as a P3 project. The project was completed on time and on budget, despite challenges for Apollo in...

This 161,460 square-foot first replacement, full-service new hospital serves northern Canada. The remote location posed challenges with material handling on this complex P3 project.

The 560,000 square-foot research and training facility houses a 55,000 square-foot mechanical room with extensive duct systems.

A large stainless steel duct system was incorporated into the design of the fume hood...

Apollo Sheet Metal supplied and installed all the ventilation requirements for the largest Vancouver Airport expansion exclusively for International and U.S. flights. This project contained multiple mechanical rooms with large duct systems to...

This 398,000 square-foot project was completed in 1995 as the largest capital project for the City of Vancouver. The building design resembles a Roman Coliseum creating some challenging duct system installations.

Rogers Arena is an 18, 860-seat hockey arena. Large duct systems were installed at a high level above the ice surface, posing unique challenges for Apollo Sheet Metal.

Winner of the VCRA Award of Excellence 2009
Trade Contractor, Chairman's Silver Award

Apollo’s work at the award-winning...